Project Scope Summary
Overview
Scope Type: Construction and commissioning of 110 km of 6" and 20" GRE pipelines from WIBS to well pads including tie-in connections and civil work
This project involved the construction and commissioning of GRE pipeline networks for water injection well tie-ins as part of the Y2021 development program in the Missan Oilfield. The scope covered the installation of approximately 110 km of 6-inch and 20-inch GRE pipelines extending from Water Injection Booster Stations (WIBS) to multiple well pads. The works were executed with full mobilization of manpower, equipment, and materials, in accordance with project specifications, safety requirements, and quality standards.
Scope
Key Work Components
- Engineering review and construction planning
- Procurement and supply of GRE pipes, fittings, and accessories
- Site preparation and civil works for pipeline corridors
- Trenching, pipe laying, jointing, and alignment of GRE pipelines
- Tie-in connections between WIBS and well pads
- Installation of supports, thrust blocks, and civil structures
- Hydrostatic testing and pipeline integrity verification
- Pre-commissioning and commissioning activities
- HSE management, quality assurance, and quality control
- Final inspection, documentation, and system handover
On Site
Project Gallery





Project Details
- Client
- Daqing Petroleum Administration Bureau Co. Ltd. Branch Iraq
- Location
- Missan Oilfield, Iraq
- Awarding Date
- 2022
- Contract No.
- JS-N4-2022-012-DPAB-IR
- Project Cost
- $6,133,309.50
- Sector
- Oil & Gas