Completed Project
Well Pads Construction — Eighth Batch
CNOOC Iraq Limited · Missan Oilfield, Iraq

✓ Completed · 2022
Project Scope Summary
Overview
Scope Type: Engineering, Procurement, Construction and Commissioning
This project comprised the engineering, procurement, construction, and commissioning of multiple well pads under the Eighth Batch development program in the Missan Oilfield. The scope included full mobilization of manpower, equipment, and materials, along with technical supervision to ensure safe and efficient execution in compliance with CNOOC Iraq Limited standards and project specifications. All work was completed successfully and handed over for operational use.
Scope
Key Work Components
- Detailed engineering and layout design for well pad facilities
- Site preparation, earthworks, and civil construction activities
- Procurement of construction materials, equipment, and utilities
- Construction of well pad foundations, structures, and access roads
- Installation of flow lines, piping, and associated facilities
- Mechanical installation and interconnections
- Pre-commissioning and commissioning activities
- HSE management, quality control, and compliance monitoring
- Final inspection, documentation, and project handover
On Site
Project Gallery





Project Details
- Client
- CNOOC Iraq Limited
- Location
- Missan Oilfield, Iraq
- Awarding Date
- 2022
- Contract No.
- CMIT-PRT-10.53-220013-S2
- Project Cost
- $3,807,500
- Sector
- Civil
Discuss Your Project
Get in touch with our team to discuss how Future Will can deliver your EPCC requirements.
Submit EnquiryOther Projects
- S2/S Oil Trunkline EPCC Project
- GRE Pipe & Civil Construction — Water Injection Wells Tie-Ins (Y2021)
- S1 Block Oil Trunk Line & Flow Line EPCC
- Water Injection Stations EPCC — Missan
- GRS Station — Abadan-Basra 48" Gas Pipeline (Shat Al-Basra)
- Engineering & Construction of Flow Lines & Trunk Lines
- View full portfolio →