Completed Project
S1 Block Oil Trunk Line & Flow Line EPCC
EBS Petroleum Company Limited · Nahrawan, Baghdad, Iraq
✓ Completed · 2019
Project Scope Summary
Overview
Scope Type: Design and Engineering of Flowlines & Trunklines, Civil, Anticorrosion protection, Tie-ins with existing facilities, Procurement, Construction & Commissioning
This project involved the execution of an EPCC contract for the provision of oil trunk lines and flow lines within the S1 Block area in Nahrawan, Baghdad. The scope covered detailed engineering, procurement of materials, construction, and commissioning activities, supported by full mobilization of manpower, equipment, and technical supervision.
Scope
Key Work Components
- Detailed engineering and design of oil flow lines and trunk lines
- Civil works and site preparation activities
- Procurement of pipes, fittings, valves, and construction materials
- Anti-corrosion coating and corrosion protection systems
- Trenching, pipe laying, welding, and installation works
- Tie-in connections with existing facilities and infrastructure
- Mechanical completion and pre-commissioning activities
- Commissioning, testing, and operational readiness support
- Quality control, HSE compliance, and final project documentation
On Site
Project Gallery
Project Details
- Client
- EBS Petroleum Company Limited
- Location
- Nahrawan, Baghdad, Iraq
- Awarding Date
- 2019
- Contract No.
- 033/SC/19
- Project Cost
- $3,807,500
- Sector
- Pipeline
Discuss Your Project
Get in touch with our team to discuss how Future Will can deliver your EPCC requirements.
Submit EnquiryOther Projects
- S2/S Oil Trunkline EPCC Project
- Well Pads Construction — Eighth Batch
- GRE Pipe & Civil Construction — Water Injection Wells Tie-Ins (Y2021)
- Water Injection Stations EPCC — Missan
- GRS Station — Abadan-Basra 48" Gas Pipeline (Shat Al-Basra)
- Engineering & Construction of Flow Lines & Trunk Lines
- View full portfolio →