Completed Project
Water Injection Stations EPCC — Missan
CNOOC Iraq Limited · Buzurgan Oilfield, Maysan Governorate

Project Scope Summary
Overview
Scope Type: EPCC (Engineering, Procurement, Construction & Commissioning)
Future Will was awarded a full-turnkey EPCC contract for the development of water injection station facilities. The main scope comprised three Water Injection Stations (BUN, BUS3 and FQS) and a Source Water Treatment in BUT. The new facilities include water injection tanks, water feed pumps, water injection pumps, chemical injection systems, sand removal and fiber ball filter skids (BUS3), instrument control systems and power distribution systems.
Scope
Key Work Components
Civil Structure
- Trenching, leveling and backfilling; compaction testing.
- Concrete works: foundations, walkways and cable trenching.
- Structural steel sheds for transformers, water feed/injection pumps and chemical injection skids.
Mechanical, Piping & Pipeline
- Installation of static equipment (tanks) and rotary equipment (water feed and injection pumps).
- Water treatment system (GRE piping, fiber ball and sand removal skids) at BUS3 and BUT.
- Carbon steel, stainless steel and duplex stainless steel piping; GRE by lamination method.
Electrical
- Cable laying, equipment installation, earth cable and OHTL installation in BUS3 and FQS.
- Cathodic protection (sacrificial anodes) for the WIS tanks.
Instrumentation & Control
- Installation and termination of all instruments; vendor control-system commissioning.
- Pressure/transmitter/gas-detector gauges, junction boxes, DCS and SIS cabinets, control valves.
Schedule
Deliverables & Milestones
| # | Description | Timeline |
|---|---|---|
| M1 | Mechanical Completion — BUN | 30 Nov 2020 |
| M2 | Mechanical Completion — BUS3 | 13 Mar 2021 |
| M3 | Mechanical Completion — FQS | 6 Dec 2020 |
| M4 | Mechanical Completion — BUT | 15 Sep 2020 |
| M5 | Provisional Completion — BUN / BUS3 / FQS | 2021 |
Standards
Special Requirements
- Design Standards: ASME B31.4, NACE MR0175/ISO 15156 for sour service.
- Climate Adaptation: Works in extreme summer conditions (up to 50°C) and dust storms.
- HSE & QA/QC: ISO 9001/14001/45001 standards; full compliance with Company safety policies.
- International Third-Party Inspection: SGS, BV, RINA, ATG involvement in FAT/SAT.
- Local Compliance: All materials certified by Iraqi Embassy and MOO Tech Directorate standards.
Supply Chain
Procurement Activities
- Full-scope procurement of all materials and equipment not free-issued by the Client.
- Purchase Orders signed with approved manufacturers for water feed pumps, tank plate, sand removal & fiber ball filter skids, chemical injection skids, AC & DC UPS, transformers, LV & MV switchgears, piping and fittings.
- Expediting, QA/QC inspections, logistics, customs clearance and site delivery.
On Site
Project Gallery






Project Details
- Client
- CNOOC Iraq Limited
- Location
- Buzurgan Oilfield, Maysan Governorate
- Awarding Date
- 2018
- Contract No.
- CMIT-PRT-10.30-180025
- Project Cost
- $34,600,000
- Sector
- Oil & Gas
Discuss Your Project
Get in touch with our team to discuss how Future Will can deliver your EPCC requirements.
Submit EnquiryOther Projects
- S2/S Oil Trunkline EPCC Project
- Well Pads Construction — Eighth Batch
- GRE Pipe & Civil Construction — Water Injection Wells Tie-Ins (Y2021)
- S1 Block Oil Trunk Line & Flow Line EPCC
- GRS Station — Abadan-Basra 48" Gas Pipeline (Shat Al-Basra)
- Engineering & Construction of Flow Lines & Trunk Lines
- View full portfolio →