Completed Project
48" × 17 km Natural Gas Pipeline — Nahrawan / Diyala
ICG Group, Pipelines Special Services · Nahrawan / Diyala, Iraq

✓ Completed · 2015
Project Scope Summary
Overview
Scope Type: Design, Supply, Installation/Erection, Testing & Successful Commissioning and Handing Over
The project covered the full execution of a 48-inch natural gas pipeline extending over 17 km in the Nahrawan / Diyala area. The work was performed on an item-rate contract basis and included complete engineering activities, material procurement, construction, quality control, testing, and final commissioning.
Scope
Key Work Components
- Detailed engineering and pipeline route verification
- Procurement and supply of pipes, fittings, and associated materials
- Site preparation, clearing, and right-of-way (ROW) development
- Trenching, pipe laying, alignment, and welding works
- Non-destructive testing (NDT) and weld inspection
- Field joint coating and corrosion protection works
- Hydrostatic pressure testing and drying of the pipeline
- Backfilling, reinstatement, and site restoration
- Pre-commissioning and commissioning activities
- Final inspection, documentation, and project handover
On Site
Project Gallery




Project Details
- Client
- ICG Group, Pipelines Special Services
- Location
- Nahrawan / Diyala, Iraq
- Awarding Date
- 2015
- Contract No.
- ICG-T/3/316
- Project Cost
- $3,525,000
- Sector
- Pipeline