Completed Project

32" × 42 km Natural Gas Pipeline — Sharhraban / Diyala

ICG Group, Pipelines Special Services · Sharhraban / Diyala, Iraq

32" × 42 km Natural Gas Pipeline — Sharhraban / Diyala
✓ Completed · 2015

Project Scope Summary

Overview

Scope Type: Design, Supply, Installation/Erection, Testing & Successful Commissioning and Handing Over

This project involved the implementation of a 32-inch natural gas pipeline extending approximately 42 km in the Sharhraban / Diyala area. The scope encompassed full engineering services, material procurement, construction, testing, and commissioning activities under an item-rate contract arrangement.

Scope

Key Work Components

  • Pipeline route assessment and detailed engineering design
  • Procurement of pipes, fittings, and construction materials
  • Right-of-way preparation and site access development
  • Pipe stringing, alignment, welding, and joint inspection
  • Trenching, lowering-in, and pipeline installation works
  • Execution of tie-ins, crossings, and special pipeline sections
  • Corrosion protection and coating application
  • Hydrostatic testing and pipeline integrity checks
  • Backfilling, reinstatement, and environmental restoration
  • Pre-commissioning, commissioning, and final handover documentation

On Site

Project Gallery

32" × 42 km Natural Gas Pipeline — Sharhraban / Diyala — photo 1
32" × 42 km Natural Gas Pipeline — Sharhraban / Diyala — photo 2
32" × 42 km Natural Gas Pipeline — Sharhraban / Diyala — photo 3
32" × 42 km Natural Gas Pipeline — Sharhraban / Diyala — photo 4

Project Details

Client
ICG Group, Pipelines Special Services
Location
Sharhraban / Diyala, Iraq
Awarding Date
2015
Contract No.
ICG-T/3/174
Project Cost
$7,041,980
Sector
Pipeline