Completed Project
32" × 42 km Natural Gas Pipeline — Sharhraban / Diyala
ICG Group, Pipelines Special Services · Sharhraban / Diyala, Iraq
✓ Completed · 2015
Project Scope Summary
Overview
Scope Type: Design, Supply, Installation/Erection, Testing & Successful Commissioning and Handing Over
This project involved the implementation of a 32-inch natural gas pipeline extending approximately 42 km in the Sharhraban / Diyala area. The scope encompassed full engineering services, material procurement, construction, testing, and commissioning activities under an item-rate contract arrangement.
Scope
Key Work Components
- Pipeline route assessment and detailed engineering design
- Procurement of pipes, fittings, and construction materials
- Right-of-way preparation and site access development
- Pipe stringing, alignment, welding, and joint inspection
- Trenching, lowering-in, and pipeline installation works
- Execution of tie-ins, crossings, and special pipeline sections
- Corrosion protection and coating application
- Hydrostatic testing and pipeline integrity checks
- Backfilling, reinstatement, and environmental restoration
- Pre-commissioning, commissioning, and final handover documentation
On Site
Project Gallery
Project Details
- Client
- ICG Group, Pipelines Special Services
- Location
- Sharhraban / Diyala, Iraq
- Awarding Date
- 2015
- Contract No.
- ICG-T/3/174
- Project Cost
- $7,041,980
- Sector
- Pipeline