Completed Project

New Intake Water Pump Station (PCC)

CNOOC Iraq Limited · Missan Oilfield, Iraq

New Intake Water Pump Station (PCC)
✓ Completed · 2014

Project Scope Summary

Overview

Scope Type: EPCC (Engineering, Procurement, Construction & Commissioning)

The project involved the complete development of a new Intake Water Pump Station under EPCC scope, supporting the strategic water management and injection systems for oil production operations. Future Will was responsible for topographic survey, architectural and structural design, engineering, and full civil and electromechanical construction. The station transfers treated river water into injection and utility pipelines across the field.

Scope

Key Work Components

Survey & Design

  • Topographic survey of the intake area and pumping corridor
  • Architectural layout of the pump station building
  • Structural design of pump foundations, slabs, beams and cable trenches

Civil Construction

  • Excavation and earthwork for intake bay and pump foundations
  • Concrete works for pump foundations, valve chambers, transformer/generator bases, building slabs and walls
  • Site development: gravel roads, drainage, fencing, lighting and control room structure

Mechanical Works

  • Installation of large-capacity centrifugal pumps
  • Assembly and grouting of vertical turbine pumps
  • Suction piping and discharge manifolds; chemical dosing and surge control

Electrical, Instrumentation & Control

  • Main LV power panels and switchgear; cabling to MCC and pump motors
  • Transformer installation, earthing grid and lightning protection
  • Control panel routing and interface with SCADA/DCS

Testing & Commissioning

  • Alignment and mechanical testing of all pumps
  • Hydrotesting of piping and megger testing of electrical components
  • Functional testing and trial operation with CNOOC representatives

Schedule

Deliverables & Milestones

#DescriptionTimeline
M1Site Handover & MobilizationAugust 2014
M2Civil and Structural CompletionApril 2015
M3Mechanical & Electrical InstallationJune 2015
M4Testing, Commissioning & Final AcceptanceAugust 2015

Standards

Special Requirements

  • Construction performed near active water channels with environmental controls
  • High groundwater conditions required dewatering and foundation sealing
  • Compliance with CNOOC and international design codes (API, IEC, ASTM)
  • PTW, confined space entry and H2S procedures followed during all phases
  • QA/QC included slump test, cube test, weld inspection and electrical continuity checks

On Site

Project Gallery

New Intake Water Pump Station (PCC) — photo 1
New Intake Water Pump Station (PCC) — photo 2
New Intake Water Pump Station (PCC) — photo 3
New Intake Water Pump Station (PCC) — photo 4
New Intake Water Pump Station (PCC) — photo 5
New Intake Water Pump Station (PCC) — photo 6

Project Details

Client
CNOOC Iraq Limited
Location
Missan Oilfield, Iraq
Awarding Date
2014
Contract No.
CMITWRS-781-PRT-10.53-30255-1
Project Cost
$16,677,494.06
Sector
Civil

Discuss Your Project

Get in touch with our team to discuss how Future Will can deliver your EPCC requirements.

Submit Enquiry