Completed Project
New Intake Water Pump Station (PCC)
CNOOC Iraq Limited · Missan Oilfield, Iraq

✓ Completed · 2014
Project Scope Summary
Overview
Scope Type: EPCC (Engineering, Procurement, Construction & Commissioning)
The project involved the complete development of a new Intake Water Pump Station under EPCC scope, supporting the strategic water management and injection systems for oil production operations. Future Will was responsible for topographic survey, architectural and structural design, engineering, and full civil and electromechanical construction. The station transfers treated river water into injection and utility pipelines across the field.
Scope
Key Work Components
Survey & Design
- Topographic survey of the intake area and pumping corridor
- Architectural layout of the pump station building
- Structural design of pump foundations, slabs, beams and cable trenches
Civil Construction
- Excavation and earthwork for intake bay and pump foundations
- Concrete works for pump foundations, valve chambers, transformer/generator bases, building slabs and walls
- Site development: gravel roads, drainage, fencing, lighting and control room structure
Mechanical Works
- Installation of large-capacity centrifugal pumps
- Assembly and grouting of vertical turbine pumps
- Suction piping and discharge manifolds; chemical dosing and surge control
Electrical, Instrumentation & Control
- Main LV power panels and switchgear; cabling to MCC and pump motors
- Transformer installation, earthing grid and lightning protection
- Control panel routing and interface with SCADA/DCS
Testing & Commissioning
- Alignment and mechanical testing of all pumps
- Hydrotesting of piping and megger testing of electrical components
- Functional testing and trial operation with CNOOC representatives
Schedule
Deliverables & Milestones
| # | Description | Timeline |
|---|---|---|
| M1 | Site Handover & Mobilization | August 2014 |
| M2 | Civil and Structural Completion | April 2015 |
| M3 | Mechanical & Electrical Installation | June 2015 |
| M4 | Testing, Commissioning & Final Acceptance | August 2015 |
Standards
Special Requirements
- Construction performed near active water channels with environmental controls
- High groundwater conditions required dewatering and foundation sealing
- Compliance with CNOOC and international design codes (API, IEC, ASTM)
- PTW, confined space entry and H2S procedures followed during all phases
- QA/QC included slump test, cube test, weld inspection and electrical continuity checks
On Site
Project Gallery






Project Details
- Client
- CNOOC Iraq Limited
- Location
- Missan Oilfield, Iraq
- Awarding Date
- 2014
- Contract No.
- CMITWRS-781-PRT-10.53-30255-1
- Project Cost
- $16,677,494.06
- Sector
- Civil